Tuesday 10 December 2013

Padstones are on; first floor joists.

General look of the progress yesterday.


Upstairs joist is almost completed.  They are putting the boards on.

Garage side of the padstone is already in place.  David put some pieces of lead between padstone and the steel to increase the contact surface.



The padstone in the garden side is still not in contact with the steel beams.  David said he wanted to wait until the wall is finished before he lower the beams onto the padstone.


One garage wall is tacked.  It looks much better now.

Hot and cold water come from kitchen side, splitting to the shower (along the ceiling) and wash basin (down along the wall).  David also found the heating pipes that the previous plumber left in place.  So he tag the pipe down along the wall to the radiator in the front of the house.

The radiator pipes in the front of the house are temporarily protected.