Saturday, 30 November 2013

Wall is taken down. Steel beams are up

Saturday morning, could't wait to see what's done yesterday ... The wall is taken doen....

The steel beams are installed.

At a close look, there is a gap between the beams and the outer skin to allow air.  The beams will rest on a long padstone on the inner skin which is being rebuilt.

Long steel spacers connect the two steel beams and keep the spacing even.

Floor joists are tuck into a steel beam.

The other side of the beams temporarily sit on bricks.

No comments:

Post a Comment